← All articles
Importing From China: The Questions Sourcing Sellers Keep Asking
Wholesale & SourcingAmazon + Walmart

Importing From China: The Questions Sourcing Sellers Keep Asking

By ASIN Metrics8 min read

At some point most sellers look at a unit cost from an overseas supplier, compare it to what they're paying domestically, and get excited about the gap. Sometimes that gap is real and it transforms a product's margins. Just as often, the difference evaporates once you add freight, duty, longer lead times, and the cash you have to commit upfront to a minimum order. Importing direct from China is a legitimate way to widen margins — but only if you run the full economics before you wire money, not after the boxes show up. These are the questions sellers ask most often before placing that first overseas order, answered the way they actually matter: in landed cost and committed cash, not headline unit price.

What does the product actually cost me — landed, not quoted?

The quoted unit price is the beginning of the calculation, not the answer. Your true cost per unit — the landed cost — has to fold in everything it takes to get a sellable unit into a fulfillment center:

  • The unit price from the supplier, including any tooling or sample costs spread across the order.
  • Freight — ocean is cheap per unit but slow; air is fast but can dwarf the unit price on anything bulky or heavy.
  • Duties and tariffs based on the product's classification, which can move your cost meaningfully depending on the category.
  • Inbound and prep — getting goods from the port to the marketplace, plus any labeling, polybagging, or compliance prep.
  • Defects and shipping damage spread across the units that actually arrive sellable.

Only once all of that is divided across the units you can actually sell do you have a real cost of goods. A unit that looked dramatically cheaper than your domestic source often lands much closer once freight and duty are in — and sometimes lands higher. Run the landed number before you commit, because that's the figure your margin depends on.

How much cash am I really tying up, and for how long?

This is the question that separates importers who scale from ones who get stuck. A direct order usually means a minimum order quantity far larger than a domestic buy, a deposit paid before production even starts, the balance paid before goods ship, and then weeks of ocean transit before anything is sellable. So you're committing a large chunk of working capital and waiting months to start earning it back. Before you place the order, be honest about whether that cash is money you can afford to have frozen for that long. A great per-unit margin is worthless if the order ties up so much capital that you can't restock your proven winners while you wait. Cash flow, not unit cost, is what usually limits how aggressively you can import.

Does the volume I have to buy actually match my demand?

Minimum order quantities are where importing margins go to die. A supplier's price gets attractive at a quantity that may be far more than you can realistically sell in a reasonable window. If the MOQ represents a year or more of demand at your current velocity, the math changes completely: you're paying storage on slow-moving stock, your cash is frozen in inventory, and the per-unit savings get eaten by the cost of holding it. The right way to size a first order is from your actual sell-through, not the supplier's price break. Buy what your real demand supports, treat the first overseas order as a test, and scale the quantity only once you've proven the product moves at the velocity you assumed.

How do I protect against the things that go wrong?

Distance and lead time amplify every problem. A quality issue you'd catch and fix in a day with a domestic supplier becomes a months-long round trip when the goods are coming from overseas, and a product that arrives slightly off-spec or damaged can't just be swapped quickly. The practical protections are unglamorous but they save orders: order and approve samples before committing to a full run, start with a smaller test order rather than betting big on an unproven supplier, build a realistic defect allowance into your landed cost so a bad batch doesn't blow up your margin assumption, and keep a domestic backup source in mind for your most important SKUs so a delayed shipment doesn't strand you out of stock during your best selling window.

Is the margin worth the added complexity at all?

Importing direct adds real work — sourcing, sampling, freight logistics, customs, longer planning horizons, and more cash at risk. That effort is justified when the landed-cost margin improvement is large enough and the product moves fast enough to be worth the commitment. It's often not worth it for a slow-moving SKU where the savings are modest and the volume is small. The cleanest way to decide is to put both options side by side on the same footing: your true net profit per unit buying domestically versus buying imported at landed cost, including the carrying cost of the extra inventory and cash you'll tie up. If the imported route wins clearly and the product has the velocity to justify the larger commitment, go. If it's marginal, the simplicity of staying domestic is often worth more than a few points of theoretical margin.

Run your imported landed cost against your real margins before you commit.

See how it works

Frequently asked questions

How big should my first overseas order be?

As small as the supplier's minimum allows while still treating it as a real test. The goal of a first order is to validate the supplier, the quality, and your demand assumptions — not to maximize the per-unit price break. Prove the product sells through at the velocity you expected, then scale the quantity on the reorder.

Why does my cheap imported unit barely beat my domestic cost?

Because the quoted unit price isn't your cost. Once you add freight, duties, prep, and a defect allowance and spread it across the units that arrive sellable, the landed cost is often much higher than the quote — sometimes close to or above your domestic source. Always compare landed cost to landed cost, never quote to quote.

Is the longer lead time a dealbreaker?

Not on its own, but it changes how you plan. Long transit means you have to forecast and reorder much earlier, and a delay can strand you out of stock during a peak window. Keep a domestic backup in mind for your most important SKUs, and make sure your cash can sit frozen through the full production-plus-shipping cycle before you commit.

sourcingimportinglanded costprofitability